init
This commit is contained in:
69
Archive/Journal/2022-09-26.md
Normal file
69
Archive/Journal/2022-09-26.md
Normal file
@@ -0,0 +1,69 @@
|
||||
# Friday
|
||||
## Focus for the Day
|
||||
Finish this mold thing
|
||||
|
||||
## Meditations from Daily Readings
|
||||
"Will you condemn the world, or redeem it?"
|
||||
|
||||
## Idea capture
|
||||
|
||||
|
||||
|
||||
# Brass Tacks
|
||||
|
||||
##### Weather Report
|
||||
Cloudy, 52/72
|
||||
|
||||
##### arise
|
||||
[x] Pack Lunch (sandwiches)
|
||||
[x] Stretch - do your foot well!!!
|
||||
[x] Daily offering and readings
|
||||
[x] Rosary
|
||||
|
||||
##### workday
|
||||
[x] Inbox 0
|
||||
|
||||
[x] Mold conveyor
|
||||
[x] Chain Guides
|
||||
[x] Connection to press frame
|
||||
[x] Lateral bracing
|
||||
[x] Fix spacing / bearings / etc.
|
||||
Bring channels in 8mm
|
||||
Span <-> Span = 2496.8mm
|
||||
[ ] 5" channel top
|
||||
[ ] 3" channel w 1/4" backer bottom
|
||||
[->] Air line fleshout
|
||||
[x] Drive tensioner
|
||||
|
||||
###### Minutia
|
||||
[x] Guard thru holes
|
||||
[->] Hardware
|
||||
[x] Levelling feet (6992K24)
|
||||
[x] Holes for shafts in guards
|
||||
[x] Slim to 3" tubes
|
||||
[x] Fix sprocket diameters
|
||||
[x] Cross-bracing height
|
||||
[x] End caps
|
||||
|
||||
116332768
|
||||
116332769
|
||||
116332770
|
||||
116332771
|
||||
832849
|
||||
832850
|
||||
832851
|
||||
|
||||
[ ] Mass, lunch
|
||||
[ ] xfer notes and concerns
|
||||
|
||||
[ ] Timesheet
|
||||
[ ] PDM
|
||||
[ ] Next Day
|
||||
|
||||
##### evening
|
||||
|
||||
[ ] Deb or Noelle
|
||||
|
||||
# Exam
|
||||
|
||||
wtf. this thing is HEAVY.
|
||||
Reference in New Issue
Block a user